Can you extend our bungalow without us moving out while the work happens?
Often, yes. We phase the work so at least one bedroom, the kitchen and a bathroom stay usable, and we agree the sequence with you before anything starts. Some jobs, like a full roof replacement, may mean short spells elsewhere, and we will say so upfront.
Do we need planning permission for a loft conversion on a single-storey home?
It depends on the roof height, the size of the conversion and whether permitted development rights still apply locally. We check the position for your address during the first visit and point you to the right application if one is needed.
How do you handle the extra insulation and airtightness that bungalows often need?
We treat them as part of the job, not an add-on. Walls, floors and roof spaces get the specification the build requires, and we allow for ventilation so the finished rooms stay dry and comfortable rather than sealed up tight.
What is a realistic timescale for a two-room rear extension?
A straightforward single-storey extension of that size usually runs around twelve to sixteen weeks on site, plus design and approval time beforehand. Weather, ground conditions and material lead times move that figure, so we give you a programme once the drawings are settled.
Can we stay in the house while you replace the flat roof over the kitchen?
Yes, in most cases. We work in sections and sheet over exposed areas at the end of each day, so the kitchen below stays in use. You will hear us, and access to the garden may be limited for a few days, but the room itself stays serviceable.
Who deals with building control and the certificates at the end of the job?
We do. We notify building control at the right stages, arrange the inspections and pass the completion certificate to you when it comes through. If you sell the property later, that paperwork is what a buyer's solicitor will ask for.